NAME: REHABILITATION & INFRASTRUCTURE OF KING ABDUL AZIZ AIRBASE DHARAN, K.S.A.
PROJECT OWNER: SAUDI ROYAL AIRFORCE
START DATE: 2002
PERIOD: 1825 Days
BRIEF: REHABILITATION & INFRSTRUCTURE OF KING ABDUL AZIZ AIRBASE

DHARAN, K.S.A.  THIS WAS A MASSIVE INTRASTRUCTURE PROJECTS, CONSISTS OF BASIC INFRASTRUCTURE FACILITES LIKE, EXCAVATIONS, LEVELLING, LAYING OF UNDERGROUD MV CALBES, ELECTRICAL NETWAORK, SUBSTATIONS, POWER LINES, SANITARY & SEWAGE NETWORK, POTABLE WATER NETWORK, TWO BIG SEWAGE TREATMENT PLANT, STORM WATER DRAINAGE, ROADS, PAVEMENTS, STREET LIGHTINGS, SIGN BOARDS, TRAFFIC LIGHTS ETC., BUT ALSO INCLUDED, SOLDIERS BARRACKS, AIRCRAFT HANGERS, SEVERAL BUILDINGS SUCH SOLDERS MESS BUILDING, HEALTH CLUB AND RECREATIONAL, CLINIC BUILDING, ADMINISTRATION BUILDING ETC.