NAME: INSTALLATION OF MACHINERY, HIGHER INSTITUTE FOR PLASTICS, RIYADH K.S.A.
PROJECT OWNER: TECHNICAL & VACATIONAL TRAINING CORPORATION
START DATE: 13/05/1428   – MAY 30, 2007
PERIOD: 1210 Days
BRIEF: INSTALLATION OF MACHINES IN WORKSHOP 1, 2, 3, AND 4 OF HIGHER INSTITUTE FOR PLASTICS.  THE MACHINES WERE IMPORTED BY THE OWNER OF THE PROJECT, “TECHNICAL & VACATIONAL TRAINING CORPORATION”.  THE WORKS INCLUDED DOWNLOAD THE MACHINERY FROM THE CONTAINERS, WITH SPECIALIZED TECHNICAL EXPERTS, WITHOUT DAMAGING THE MACHINES, AND TRANSPORTING THE VERY HEAVY AND HUGE MACHINES, INSIDE THE WORKSHOP, MAKING ELECTRICAL AND CALBE NETWORK, AIR COMPRESSED  NETWORK AND COLD WATER PIPING NETWORK, SPECIAL FOUNDATIONS, DRAINAGE CHANNELS ETC FOR THESE SPECIALLY IMPORTED MACHINES.