| NAME: INFRASTRUCTURE PROJECT PHASE 3 AND 4 |
| PROJECT OWNER: AL-JOUF UNIVERSITY – KSA |
| START DATE: 02/09/1438 – May 28, 2017 |
| PERIOD: 24 MONTHS |
| BRIEF: THE IS THE 3RD AND 4TH PHASE OF INFRASTRUCTURE OF THE AL-JOUF UNIVERSITY. SCOPE OF WORK INCLUDE, EXCAVATIONS, LEVELLING, LAYING OF UNDERGROUD MV CALBES, ELECTRICAL NETWAORK, SUBSTATIONS, POWER LINES, MANHOLES SWITCHGEAR BUILDINGS, EMERGENCY GENERATOR BUILDING. |